Steps to Successful Construction

1. Preparatory Phase

  • Preparation begins with a thorough diagnosis of the object’s condition. Then, technical documentation is developed for planning the work.

2. Demolition Works

  • Removal of outdated cladding to prepare surfaces.
  • Demolition of unnecessary partitions to optimize space.
  • Disassembly of old engineering systems in preparation for renewal.

3. Planning and Execution

  • Replanning with the erection of new partitions according to project requirements.
  • Replacement of window and door blocks to increase energy efficiency and safety.

4. Engineering Works

  • Collaboration with trusted partners for the installation of electrical and sanitary systems.

5. Finishing Works

  • Professional execution of plastering and screeding works on walls and ceilings.
  • Creation of high-quality screeds as a base for floor coverings.
  • Installation of parquet, laminate, tiles, and other floor coverings.
  • Wall cladding from traditional wallpapering to modern materials.
  • Installation of various ceiling structures according to interior design.

6. Surface Finishing

  • Painting surfaces to complete the external appearance of the rooms.
  • Application of decorative plasters according to individual customer preferences.

7. Final Assembly

  • Installation of electrical and lighting systems for room functionality.
  • Fitting internal doors, skirting boards, and thresholds to complete the interior.
  • Connection of sanitary equipment to ensure comfort in usage.

8. Quality Control

  • Thorough inspection of all completed works before handing over the object to the client.